Valor DV-190 Owner's Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 38
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
Ceramic Logs Installation (739IL)
Unpack the ceramic logs very carefully to avoid damaging the fragile material. Install the logs as shown below. Please
note that the position of the logs is critical to ensure proper performance of the appliance.
1. Spread the decorative charcoals on
each side of the log tray, covering the
sheet metal as shown.
DO NOT PUT ANY DECORATIVE
CHARCOAL PIECES WITHIN THE
PILOT SHIELD AREA.
2. Place the rear log centering it side to side in the
rebox. Position forward until it sits against the sheet
metal return behind the burner.
3. Place the front left log on top of the burner with its
front edge resting slightly on the window frame.
4. Place the front right log on the top of the burner with
its left end abutted to the front left log and its front
edge resting slightly on the window frame.
Both front logs to rest slightly on the
edge of the rebox window frame.
Center the front logs side to
side in relation to the rebox
5. Identify the right cross log; it has
a hole under on of its end and it is
the shortest cross log. Place it on
the right pin located on the rear log.
Rest its other end in the crook of the
front right log.
6. Identify the middle cross log. It does not have a
hole underneath. Place its narrow end on the at
depression in the rear log next to the right cross log
on the rear log. Place its wider end on the front log.
7. Identify the left cross log; it has a hole under its
narrow end. Place its narrow end on the pin located
on the rear log. Rest its wider
end on the the crook in the
front left log at an angle of
approximately 30 degrees
from the center line of the
replace to allow for the
ame to come up in front of
the rear log.
Rear Log
against
Sheet Metal
Return
17
INSTALLATION
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 37 38

Comments to this Manuals

No comments